Thameslink Depots & Stabling

Enabling Network Rail to deliver the Thameslink programme

DEG Signal were appointed to provide signalling design services to Mouchel Rail as part of their Multi-Disciplinary Design contract with Network Rail to deliver Key Output 2 of the Thameslink Programme.

Signalling designs for new sites
This involves GRIP 3 signalling design at a number of sites identified for the potential provision of depot and stabling facilities for the new Thameslink rolling stock. The locations proposed for the new facilities include, Brighton, Horsham, Three Bridges, Tonbridge, Hornsey, Selhurst, Cricklewood and Bedford.

Developing signalling scheme
DEG Signal developed GRIP3 signalling documentation in the form of Signalling Scheme Sketches, Outline Project Specifications and where required Option Selection Reports to identify a single option to take forward to GRIP Stage 4.